|
The Gravey Compound - Phase 1!
December 16, 2007
Photos: Scott Millett / Farkin.net
Jared Graves dropped us a line w/ some photos of his "new" backyard! Here's what he had to say...
"Gravey compound construction is moving along nicely, now have a good couple jumps that are all packed in and smooth and 100% rideable.
consists of a 7.5 meter jump to a 9.5 meter (approx 31 feet) with 6 foot lip and landing, and thats with a tape measure, not a guess, the 2nd one is a big old floater, feels so nice to hit! I'm quite happy with how the compound is coming along.
I have big plans for my land, a pump track, a couple big dirt jump lines, and some more traditional bmx type stuff and some slalom type stuff. Basically anything I can cram into 2 acres!
For now we are busy building a main big dirt jump line and a supercross style rhythum line..."
|